Purchase Proposal Justification
PURCHASE PROPOSAL JUSTIFICATION
Description also available in video format (attached below), for better experience use your desktop.
Introduction
Purchase Proposal Justification is a formal document prepared to explain and defend the need for purchasing new equipment, machinery, or services in a hospital.
It ensures that procurement decisions are:
Need-based
Financially justified
Technically appropriate
Aligned with hospital goals
In hospital administration, no equipment should be purchased without proper justification because medical equipment involves high cost, safety risks, and long-term operational impact.
Objectives of Purchase Proposal Justification
To prove the clinical necessity of the equipment
To justify the financial investment
To evaluate technical suitability
To ensure cost-effectiveness
To obtain approval from management/finance committee
Components of Purchase Proposal Justification
Identification of Need
Why is the equipment required?
Is it a replacement or new addition?
Is current equipment outdated, damaged, or insufficient?
Example:
“The hospital currently has one ventilator which is insufficient for ICU bed strength of 10 beds.”
Clinical Justification
How will it improve patient care?
Will it reduce mortality/morbidity?
Is it required as per NABH/NABL standards?
Example:
“Multiparameter monitors are essential for continuous monitoring of ICU patients as per NABH standards.”
Workload & Utilization Data
Patient load statistics
Number of procedures performed
Waiting time analysis
Example:
“OPD load increased by 30% in last year, leading to delay in diagnostic imaging services.”
Technical Specifications
Required features
Compatibility with existing systems
Power requirements
Space requirements
Prepared usually in consultation with:
Doctors
Biomedical engineer
Nursing staff
Financial Justification
Includes:
💰 Capital Cost
Purchase price
Installation cost
Transportation
💸 Recurring Cost
Maintenance
Consumables
Calibration
AMC/CMC charges
📊 Cost-Benefit Analysis
Revenue generation
Savings from outsourcing
Break-even analysis
Alternatives Considered
Repair existing equipment
Lease option
Outsourcing service
Sharing with other departments
Risk Assessment
Safety risks
Training requirements
Backup support
Power backup need
Approval & Committee Review
Usually approved by:
Purchase Committee
Medical Superintendent
Finance Department
Hospital Administrator
Flow of Purchase Proposal in Hospital
Department Head → Store → Biomedical → Finance → Purchase Committee → Management Approval → Vendor Selection → Purchase Order
Importance in Hospital Administration
Prevents unnecessary purchase
Controls hospital expenditure
Improves resource utilization
Ensures compliance with NABH standards
Reduces equipment downtime
Example of Purchase Proposal Justification
Equipment Name: Defibrillator
Department: ICU
Reason: Existing defibrillator is 10 years old and frequently malfunctioning.
Clinical Need: Essential for emergency cardiac cases.
Estimated Cost: ₹2,50,000
Revenue Potential: Improves emergency response and ICU survival rate.
Recommendation: Immediate replacement required.
Common Mistakes in Purchase Justification
No workload data
No cost analysis
Emotional justification instead of factual
Ignoring maintenance cost
No consultation with biomedical team
Video Description
·
Don’t forget to do
these things if you get benefitted from this article
oVisit our Let’s
contribute page https://keedainformation.blogspot.com/p/lets-contribute.html
o
Follow our page
o
Like & comment
on our post
·

Comments